CASERONES MATERIAL HANDLING EQUIPMENT DCI Engineers
SAG Mill Recirculation Conveyor which was an enclosed, gallery style, stacker conveyor Drive and GTU tower Drive and take up building Project Highlight The engineering staff used special steel detailing, based on local Chilean code requirements, to accommodate the sites heavy snow and seismic loading. Location: La Serena, Chile